Recent Projects

SPC’s continued growth has been based on results, to achieve this high level of attainment we have polished our service to ensure the projects we deliver are on budget, on time and SNAG FREE! Our approach is simple, ‘We are only as good as our last job!’

In 2011 SPC delivered over 30 retail projects for various clients across the UK and Ireland and our clients have acknowledged our commitment, knowledge and drive by rewarding us with new schemes for 2012 and 2013.

We have recently undertaken a marketing and recruitment drive to take our business to the next level and we’re currently speaking to other retailers, developers, banks and commercial enterprises to assist them with their development aspirations.

featured-projects

Sale Property Consultants deliver the ‘FLAG SHIP’ BANK Fashion Store at the Trafford Centre, Manchester VIEW HERE

Sale Property Consultants deliver the ‘FLAG SHIP’ BANK Fashion Store at the The Victoria Centre, Belfast VIEW HERE

Recent Projects

Loading Images
BANK Livingston++SIZE Hull++SUPERDRY Speke++JD Coatbridge++BANK Edinburgh++SIZE Belfast++Bank Blackburn++JD Stirling++BANK Newcastle-upon-Tyne++Size? Bold Street, Liverpool.++A basement refurbishment and modifications to the sales area. The small but intricate project demonstrated that SPC can deliver the small ‘out of hours’ schemes to the same level of success as the larger projects. The project was delivered in the two week time frame and below budget.BANK Speke++Bank Speke++JD Blackburn++BANK Macclesfield++Leicester PO++BANK & JD Wakefield++BANK Glasgow-Fort++JD Clydebank++BANK Clydebank++JD Sports, Hounds Hill Shopping Centre Blackpool.++The strip out and fit out of an existing unit to create a new retail outlet including back of house and stock room facility. The scheme which included a new stair case and two new microlifts, was delivered in the 4 week and 4 day programme in time for the Christmas trade.BANK Bradford++featured-projects++Bank-Grimsby++The refurbishment of an existing Bank Store to implement the new Bank Concept.  Although during the 16 day project we had to absorb several variations the project was still delivered to the contracted completion date snag free!Bank Fashion, Middlebrook Retail Park, Bolton.++A 6500 square foot retail unit was the largest store rolled out by Bank Fashion in 2009 and SPC ensured that with our close supervision the store was handed over to the client after the 6 week programme and was below budget.As with all our projects we encourage the contractor to ensure the works are at an advanced stage to allow us to snag and push for a snag free project at handover, on this project we achieved this.JD Sports, Paisley Shopping Centre, Paisley.++SPC’s first project of 2010 has been successfully delivered! This dilapidated unit was refurbished on a very tight budget and delivered in just 11 days on site. We assisted the client in looking at ways to maximise the existing infrastructure of the unit and spending money of new fixtures where necessary. The scheme was delivered on time and to the quality that satisfied the clients expectations.Bank Fashion, Meadowhall Shopping Centre, Sheffield.++This store was a major shop fit which required the strip out of a steel mezzanine floor and the implementation of a new category ‘A’ shop fit incorporating new components from a new supply chain. The tight schedule was achieved in the 6 week time frame and the store looked very impressive and was well received by the client and the public.4C Community Centre++SPC have been appointed as Quantity Surveyor for a new eco friendly community centre in Ashton under Lyne. Using innovative design and materials such as hempcrete walls and floors, gluelam beams and grass roof, our Quantity Surveying team have risen to the challenge and completed a value engineering exercise to achieve the £1.6 million budget. The scheme is being procured under a Construction Management Contract with the principle consultant acting as the main contractor.  SPC have produced schedules of work which have been issued to a selection of handpicked contractors with a view to commencing works in June 2010.Bank Fashion, Kingsgate Shopping Centre, Huddersfield.++A simple refresh and refurbishment of an existing trading store, this tight programme was completed within the allotted 17 day programme and was delivered on budget and to a high quality.Bank Fashion - The Mall, Grange Road, Middlesbrough.++The continued roll out of the Bank Fashion stores although this incorporated a late variation which required the construction of a glass wall in the sales area to create additional merchandising space. The late change was managed and the scheme was still delivered on time, on budget and to the highest quality.Bank Fashion - Fort Kinnaird Retail Park, Edinburgh. ++Working in Scotland is different to working in the rest of the United Kingdom inasmuch that the Building Warrant system must be understood and adhered to. SPC successfully managed the Building Warrant application until approval to build was secured, following which the strip out and shop fit of an existing retail unit was completed in the allotted five week period, the scheme was also delivered below budget and to the highest quality.Bank Fashion, Hounds Hill Shopping Centre, Blackpool.++Introducing the new concept being rolled out by Bank, the fit out of a newly constructed retail unit incorporated the installation of a double height shop front, new sales and fitting room area, back of house and stock room facility.The scheme achieved the 6 week programme, an exceptional level of quality and was delivered on budget.  This would be the first of several Bank Fashion schemes to be awarded to SPC during the course of 2009.